On this page
- History and housing in Shockoe Bottom
- Terrain, trees and water in Shockoe Bottom
- Storms and weather that matter in Shockoe Bottom
- Best gutter setup for Shockoe Bottom
- Common gutter work in Shockoe Bottom
- When to book gutter work in Shockoe Bottom
- Before you hire in Shockoe Bottom
- Roads, waterways and landmarks around Shockoe Bottom
- Nearby
Shockoe Bottom is the low ground where Richmond's first streets were laid out, between Church Hill and Shockoe Hill. Today it is restaurants, shops, offices and apartments in rebuilt 19th-century commercial blocks and former tobacco warehouses. Gutter work here is mostly commercial: box gutters, scuppers, collector heads and big downspouts.
| Location | Between Church Hill and Shockoe Hill, along the James |
| History | Part of William Mayo's 1737 plan; rebuilt after the 1865 fire |
| Building types | Italianate commercial blocks, converted tobacco warehouses |
| Floodwall | James River Flood Wall completed 1995 |
| 2004 flood | Gaston: 20 blocks condemned |
| Common systems | Box gutters, scuppers, collector heads, internal drains |
| Zip code | 23219 and 23223 |
History and housing in Shockoe Bottom
Shockoe Bottom holds much of the land in Colonel William Mayo's 1737 plan of Richmond. It grew as a tobacco and trading district, and in the 19th century it was the second-largest domestic slave trading center in the country. Evacuating Confederate forces set the tobacco warehouses alight in April 1865, and the fires destroyed much of the area. It was rebuilt in the late 1860s and 1870s, mostly in a commercial Italianate style, and declined from the 1920s. Tobacco Row's warehouses were converted to apartments from the mid-1990s.
The district's buildings have mostly flat or low-slope roofs behind parapets, draining through scuppers into collector heads and downspouts, or through internal drains. Older commercial fronts have box gutters behind their cornices.
Terrain, trees and water in Shockoe Bottom
The Bottom sits in the valley of Shockoe Creek, now piped underground, at the foot of two hills. After centuries of river floods, the James River Flood Wall and Canal Walk were completed in 1995, and the city's flood protection system runs 3.28 miles and protects 750 acres. Water from the hills, though, still drains into the Bottom.
Storms and weather that matter in Shockoe Bottom
On August 30, 2004, the remnants of Gaston stalled over Richmond. Up to 12 inches fell downtown, the Shockoe Creek basin flooded, and 20 blocks of buildings were condemned with water up to 10 feet deep. The Richmond Free Press noted that the floodwall can create flooding behind it when heavy rain cannot escape to the river. Gutters cannot stop flooding on that scale; they matter for the building envelope in ordinary storms.
Best gutter setup for Shockoe Bottom
| Part | What usually suits Shockoe Bottom |
|---|---|
| Gutter | Box gutters, scuppers and collector heads sized to the roof |
| Material | Heavy aluminum, steel or copper |
| Downspouts | 4x5 or 5x6 rectangular, or 6-inch round, connected to storm drains |
| Hangers | Heavy straps and brackets |
| Guards | Grates at scuppers and roof drains |
| Cleaning | Spring and fall, plus after major storms |
| Discharge | To storm drains, not the sidewalk |
| Main risks | Clogged scuppers, failed collector heads, parapet leaks |
| Permit or review | City of Richmond; Commission of Architectural Review, if in a City Old and Historic District (guidelines) |
Common gutter work in Shockoe Bottom
| House type | Typical gutters | What usually comes up |
|---|---|---|
| Italianate commercial block | Box gutter behind a cornice | Lining failure, stained brick fronts |
| Converted warehouse | Parapets, scuppers, internal drains | Clogged drains, ponding on the roof |
| Mixed-use building with roof deck | Internal drains and scuppers | Debris from decks clogging drains |
| Newer infill | Box gutters or K-style | Undersized downspouts |
See commercial gutters and gutters, trees and storms in Richmond.
When to book gutter work in Shockoe Bottom
- Late fall: the cleaning most houses need, once the willow oaks, red maples and tulip poplars have dropped. Under big trees, plan on two visits.
- Winter: the easiest time to get a date for new gutters or a replacement. Installers want dry days above freezing for sealant.
- Spring: a second cleaning for catkins, seeds and pollen, and the time to fit guards before summer storms.
- Late summer: check hangers and downspout straps before the tropical season peaks in August and September.
| If you see | Book |
|---|---|
| Overflow in a downpour | Pitch check, extra downspout or 6-inch gutter |
| Ice hanging along the eave | Hanger and fascia check once it melts |
| Seedlings growing in the trough | Cleaning, then guards |
Before you hire in Shockoe Bottom
Ask which Virginia license the firm holds and check it on DPOR License Lookup. A licensed residential contractor also brings access to the state's Contractor Transaction Recovery Fund if a dispute ends in a court judgment you cannot collect. Ask what size gutter, what coil thickness, which hangers and how many downspouts the price includes, and whether fascia repair and drain-line testing are extra.
Roads, waterways and landmarks around Shockoe Bottom
- Streets: Main, Cary and Franklin Streets; 17th and 18th Streets
- Landmarks: The 17th Street Market, Tobacco Row, Main Street Station, the Canal Walk
- Waterways: The James River; Shockoe Creek, now underground
- Neighbors: Church Hill, Shockoe Slip, downtown, Jackson Ward
